After Construction Settlement Prediction of the High Rock Filled Embankment Based on Improved GM(1,1)

The hight of the west shanghai-chengdu highway rock filled embankment is more than 72m. In order to precisely predict the after construction settlement,based on the gray theory,the equal time interval GM(1,1) model was established and made some improvements.By use of the improved GM(1,1) model,the after construction settlement of the high rock filled embankment was predicted. Compared with the measured data,the predicted data has a good fitness.It shows that the predict precision of the improved GM(I,l)model is much higher than that of the conventional model.Its worth to popularize this new method in predicting the settlement of high rock filled embankment.

high rock filled embankment after eonstructian settlement imnraved CTM(1,1)model

YANG Chengzhong TAO Xiaomin HE Guoxian

Engineering Research Center of Railway Environmental Vibration and Noise,Ministry of Education,East China Jiaotong University,Nanchang,Jiangxi,China,330013

国际会议

The 3rd International Conference on Logistics and Supply Chain Management 2010(第三届物流与供应链管理国际研讨会)

长沙

英文

242-246

2010-07-18(万方平台首次上网日期,不代表论文的发表时间)