Simulation System on Operations of Transfer Stationin Hydropower Development Construction Supply Chain
Supplying of raw materials has been complex and important in large-scale hydropower development projects.Generally,itd better to establish a certain number of transfer stations to implement the raw materials storage,transit,supply businesses.In this paper,the significance and the state of the art of research on Construction Supply Chain were firstly introduced briefly.A three-echelon aggregative construction supply chain structure in large-scale hydropower construction project was proposed and functions of transfer station was studied.Following with introduction of transfer station operations workflow,the architecture of Simulation System on Operations of Transfer Station and its inputing,processing,outputing mode were highlighted discussed.Finally the steps for simulation were given,and its analyzed how to be used in Decision Support for Transfer Station Operations.
Hydropower Projects Construction Supply Chain Transfer Station Simulation System Decision Support
LIU Zhenyuan ZHENG Yongkuan
Institute of Systems Engineering,Huazhong University of Science and Technology,Wuhan,Hubei,China
国际会议
The 3rd International Conference on Logistics and Supply Chain Management 2010(第三届物流与供应链管理国际研讨会)
长沙
英文
247-254
2010-07-18(万方平台首次上网日期,不代表论文的发表时间)