Integrated UF-RO Direct Coupling Process
1 UF & RO: the Ideal Partnership Why UF Pretreatment? Ensure RO Reliability Remove colloidal matters, bacteria and inorganic suspended solids which will block the feed channels causing pressure drop Remove sparingly soluble salts water, minimizing scaling To minimize fouling due to bacteria growth
Min Luo
GE Water & Process Technologies, Beijing, P.R. China
国际会议
2010 Asia-Pacific Conference on Desalination and Water Reclamation(2010 亚太脱盐大会)
青岛
英文
123-126
2010-06-22(万方平台首次上网日期,不代表论文的发表时间)