会议专题

Integrated UF-RO Direct Coupling Process

1 UF & RO: the Ideal Partnership Why UF Pretreatment? Ensure RO Reliability Remove colloidal matters, bacteria and inorganic suspended solids which will block the feed channels causing pressure drop Remove sparingly soluble salts water, minimizing scaling To minimize fouling due to bacteria growth

Min Luo

GE Water & Process Technologies, Beijing, P.R. China

国际会议

2010 Asia-Pacific Conference on Desalination and Water Reclamation(2010 亚太脱盐大会)

青岛

英文

123-126

2010-06-22(万方平台首次上网日期,不代表论文的发表时间)