Task Scheduling Algorithm Based on Limit Theorem of Parallel Test Finish Time
A test task scheduling algorithm-TSUL (Task Scheduler based on UUTs model and Limit Theorem of parallel test finish time) algorithm is introduced in this paper. Using the limit theorem of parallel test finish time in analysis and design, the algorithm determines the minimum time to complete all the parallel tasks. Its result can approach or reach the optimal solution as close as possible. The instances prove that TSUL algorithm is a kind of effective optimum algorithms for static parallel test task scheduling.
Parallel test task scheduling multitask
Cui Shaohui Fang Dan Chen Weirong Li Yuntao
Ordnance Engineering College,Shijiazhuang 050003 China Unit 69080 of PLA,Urumqi 830001 China Unit 61906 of PLA,Langfang 102800 China
国际会议
厦门
英文
1527-1531
2010-05-22(万方平台首次上网日期,不代表论文的发表时间)