会议专题

The Scheduling of Project Time, Cost and Product Quality

To optimze the product quality as well as project cost, a discrete time/cost/product quality trade-off model used for product development projects was presented on the theoretical basis of resource constrained project scheduling problem (RCPSP). According to the characteristics of product development project, the project cost is calculated by the price of resources, and the quality function deployment method (QFD) is used to quantitatively calculate product quality. A brand and cut algorithm was presented to solve the model. Finally the model and its algorithm were verified by a project case.

project management product quality resource constrained project scheduling

Wuliang Peng Zhongliang Zhang Zhaofu Tian

School of Economics and Management, Shenyang Ligong University, Shenyang 110168

国际会议

The 22nd China Control and Decision Conference(2010年中国控制与决策会议)

徐州

英文

150-154

2010-05-26(万方平台首次上网日期,不代表论文的发表时间)