Analysis of symbolic deduction based scheduling algorithm for the production scheduling problem under time uncertainty
This paper analyzes the symbolic deduction based scheduling algorithm (SDBSA) for the production scheduling problem under time uncertainty in detail. First, the uncertain interval based symbolic deduction method (UIBSDM) which is used to deal with time uncertainty is analyzed in theory. Second, the adaptability of UIBSDM based scheduling plan and the effectiveness of dispatching rules are analyzed in simulation experiments. Numerical computational results show that SDBSA is effective for the problem of production scheduling under time uncertainty.
production scheduling symbolic deduction uncertainty
Wang Zheng Song Ying Zhang Yuxian
Department of Automation, Tsinghua University and TNLIST, Beijing, P. R. China
国际会议
长沙
英文
555-558
2010-03-13(万方平台首次上网日期,不代表论文的发表时间)