Rockburst Risk Evaluation for Stage Excavation of Underground Powerhouse

The main powerhouse is the most important one for a hydropower station. It usually located in complex geological environment with high geostress. So that rockburst risk evaluation is very significant for actual construction. Stage excavation is very common in the building of underground powerhouse. It has practical significance to forecast rockburst according to the firstly excavated stage. Numerical simulations were done to analysis the distribution of the secondary stress field in order to evaluate the rockburst risk. The results show that rockburst would occur at the bottom angles of the later stage if rockburst occurred in the earlier stage, and rockburst risk of the sidewall would be weaker. Rockburst would also be weaker in the firstly excavated stage at the same time. Because of stress of the arch increased, support of the arch should be enhanced during the following construction.

underground powerhouse rockburst stage excavation numerical simulation

Dao-Hong Qiu Le-Wen Zhang Shu-Cai Li Huai-Feng Sun De-Yong Zhang

Geotechnical and Structural Engineering Research Center,Shandong University Jinan,250061,P.R.China

国际会议

2009 International Symposium on Risk Control and Management of Design,Construction and Operation in Underground Engineering(地下工程设计、施工、运营安全风险控制及管理国际会议 IRCM09)

大连

英文

145-147

2009-10-20(万方平台首次上网日期,不代表论文的发表时间)