Risk Analysis for EPB Shield Construction of River –Crossing Tunnel

In this paper, the expert investigation, analytical hierarchy process (AHP) and fault tree analysis (FTA) are employed in the appraisal of the risk of river-crossing shield tunnel, which is usually high due to high-pressure water, gravel layer and cystic uneven marsh gas. The result shows that the classification of thirteen kinds of risk is ascertained by expert investigation, and the tunneling excavation soil surface instability under river bottom, connected aisle, tool changing with pressure under river bottom-the relative weight of the basic risk of which are all ascertained by AHP and the marsh gas explosion are all high-risk events.The paper also analyzed the marsh gas explosion accident by FTA, got 81 least cut sets and 6 least path sets, and put forward 6 ways to avoid such explosion. Finally, countermeasures to high-risk events are provided, which offer references for guaranteeing the implementation of the project.

risk analysis river-crossing shield tunnel high-pressure water marsh gas

Renping Dai Quan mei Gong Shun hua Zhou Guan nan Zhou Sun hua Liu

Key Laboratory of Road and Traffic Engineering of Ministry of Education,Tong jig University,Shanghai Hangzhou Subway Group Co.,Ltd,Hang Zhou,Zhen kiang,31002,China

国际会议

2009 International Symposium on Risk Control and Management of Design,Construction and Operation in Underground Engineering(地下工程设计、施工、运营安全风险控制及管理国际会议 IRCM09)

大连

英文

198-202

2009-10-20(万方平台首次上网日期,不代表论文的发表时间)