Design and Implementation of Control System for Platform Sinking Hoists
Aiming at the control problem of sinking hoists with low precision of the speed adjustment and low automation, a synchronous centralized control system of platform sinking hoists based on variable-frequency adjustable-speed technology is designed and implemented.Firstly,set PLC as the centralized controller,and the PLC adjusts the hoisting height of four sinking hoists using PID synchronous strategy to keep the platform horizontal in the range of allowable error. Secondly,develop the host computer configuration software to realize the real-time monitoring of the systems running state. Finally, the validity and feasibility of the system is proved according to the field test.
sinking hoists centralized control synchronous control vat-frequency adjustable-speed system PLC
Wang Ying Zhu Zhencai Zhou Gongbo Zhang Aijun
College of Mechanical and Electrical Engineering China University of Mining and Technology Xuzhou, China
国际会议
长沙
英文
770-773
2009-10-10(万方平台首次上网日期,不代表论文的发表时间)