会议专题

Simulation Calculation Research of Long Span CFST Arch Bridge Based on Optimization Algorithm

For a concrete filled steel tubular (CFST) arch bridge, the steel tubular arch ribs is erected at first and then concrete is pumped into steel tubes to form CFST arch ribs. In general, the steel tubular arch is hoisted segment by segment through cable crane and the stayed cables are used to maintain stability and balance. Therefore, the determination of the stayed-cable forces and construction camber value of the erected rib segments becomes the key issue to ensure construction quality and safety. The forward iteration analysis method, which combines finite element method with optimization method as provided in this paper, can easily and effectively determine the stayed-cable forces and construction camber value in the erection of the rib segments, and the stay cables can be tensioned to their target force values only at one time. Finally, the example of Zhijnghe CFST deck arch bridge is demonstrated to prove the correctness and affectivity of the present method.

concrete filled steel tubular arch bridge optimization finite clement method iteration

Guo-fu Sun Shu-cai Li Xue-jun Zhou Dou-dou Liu

The Research Centre of structure Engineering Shandong University Jinan, China Department of Business The Research Centre of structure Engineering Shandong University Jinan, China School of Civil Engineering Shandong Janzhu University Jinan, China Department of Business Administration Shandong University of Finance Jinan, China

国际会议

2009 Second International Conference on Intelligent Computation Technology and Automation(2009 第二届IEEE智能计算与自动化国际会议 ICICTA 2009)

长沙

英文

1168-1171

2009-10-10(万方平台首次上网日期,不代表论文的发表时间)