会议专题

Study on Endless Loop Node Checking Algorithm for BOM

A phenomenon of endless loop node often appears in BOM management, which is that one of the child components of a part contains the part itself in the assembly relationship and can result in endless loop of BOM traversal while working out Material Requirements Planning. Because of the high complexity of BOM and the slow computation speed of the algorithm based on the depth-first or breadth-first search technique to check endless loop nodes, a node compressing algorithm is presented to solve the problem. The analysis of computing complexity and illustrative example indicate that the algorithm is efficient and feasible.

BOM endless loop node node compressing algorithm

Huang Xuewen

Dept. Management Daliaa University of Technology Dalian, China

国际会议

2009 Second International Conference on Intelligent Computation Technology and Automation(2009 第二届IEEE智能计算与自动化国际会议 ICICTA 2009)

长沙

英文

3638-3642

2009-10-10(万方平台首次上网日期,不代表论文的发表时间)