会议专题

Changchun City Water Demand Forecast

Explained the necessity of water forecast, analyze and study the actual conditions of Changchun and choice forecast technique, elaborate the basic principle of forecast method by the new generation of old and the computational process. According to water consumptions statistical data of Changchun in past 12 years, forecasting the urban water demand of Changchun in 2010, 2015 and 2020. And combining the supply capacity of waterworks in Changchun analysis to obtain: Dont need to establish the new Waterworks in the short-term

water forecast urban water demand dimension By new generation of old

WU Haixia WEI Xindong CUI Jindan WANG Xiaoxuan

Guangzhou City Construction College, Cuangzhou, China Jilin Institute of Architecture and Civil Engineering, Changchun, China

国际会议

The 6th International Symposium of Asia Institute of Urban Environment(亚洲城市环境学会第六届国际会议)

长春

英文

229-232

2009-09-20(万方平台首次上网日期,不代表论文的发表时间)