会议专题

Application of LMBP Forecast Model in International Construction Claim

Recently, international construction claim plays an important role in the management of the construction contract. In this paper, aiming at the drawbacks of traditional BP arithmetic, an improved BP neural network is introduced based on the L-M arithmetic so as to accelerate the convergence speed. A forecast model of nonlinear system is set up based on the LMBP neural network by studying all of the factors which may bring on the construction claim, the possibilities in the construction claim are forecasted by the application of this network model. Finally, the simulation and practice results demonstrate the effectiveness of the method in this paper, then, a new approach is advanced for the management of construction claim to international contractors.

International Construction Claim LMBP Forecast Model

Shujing Zhou Lanjing Liu ChaoWu

College of Civil Engineering Hebei University of Engineering Handan, China

国际会议

2009 Ninth International Conference on Hybrid Intelligent Systems(第九届混合智能系统国际会议 HIS 2009)

沈阳

英文

1-6

2009-08-12(万方平台首次上网日期,不代表论文的发表时间)