The Development of the Generation Expansion Planning System using Multi-Criteria Decision Making Rule
The power expansion planning is large and capital intensive capacity planning. In the past, the expansion planning was established with the proper supply reliability in order to minimize social cost. However, the planning cannot use cost minimizing objective function in the power markets with many market participants. This paper proposed the power expansion planning process in the power markets. This system is composed of Regulator and GENCOs model. Regulator model used multicriteria decision making rule. GENCO model is very complex problem. Thus, this system transacted the part by several scenarios assuming GENCO model.
Power expansion planning Regulator’s model Multi-criteria decision making Procedure of planning Power market
Seokman Han Jeongin Lee Taeyoung Kim Seongwan Park Balho H. Kim
Department of Electrical, Information & Control, Hongik University, 72-1 Sangsu-dong, Mapo-gu, Seoul Hongik University, Korea
国际会议
The International Conference on Electrical Engineering 2009(2009 电机工程国际会议)
沈阳
英文
1-6
2009-07-05(万方平台首次上网日期,不代表论文的发表时间)