Research on Shipbuilding Schedule Based on Genetic Algorithm
The overall arrangement in shipbuilding project is a strategic problem, whose purpose is to obtain an optimal scheme with the shortest days for construction and the best economic benefits. Here a multiobjective model of shipbuilding schedule is proposed, and a new genetic algorithm based on a vector group encoding method in order to effectively solve it. The shipbuilding scheduling problem with minimizing the maximum completion time among all the jobs and minimizing the total earliness/tardiness penalty of all the jobs is a parallel machine scheduling one, but it is different from other parallel machine scheduling problems with the following characteristics. Firstly, the machines are non-identical; secondly, the sort of job processed on every machine can be restricted. For our proposed algorithm, its encoding method is simple and can effectively reflect the virtual scheduling policy, which can vividly reflect the numbers and sequences of these processed jobs on every machine, and enables the individuals generated by crossover and mutation to satisfy process constraint. Numerical results show that our proposed algorithm is efficient, and outperforms the common genetic algorithm.
Duanyang Zhao Jiaquan Gao Qingxiang Xu
Zhijiang College,Zhejiang University of Technology,Hangzhou,Zhejiang Province,China 310024
国际会议
2009 IEEE International Conference on Information and Automation(2009年 IEEE信息与自动化国际学术会议)
珠海、澳门
英文
1619-1624
2009-06-22(万方平台首次上网日期,不代表论文的发表时间)