Products Development Process Based on DSM and Its Optimization

To solve the complex process problem caused by information coupling, concurrent product development process model based on design structure matrix (DSM) is developed. The multi-target genetic algorithm (GA) optimization toward numerical DSM was proposed to optimize the information stream orientation and obtain the optimal activities execution sequence. Based on above, rework time caused by time overlapping and iteration was calculated for coupled and uncoupled activities. Under the cost constraint, the optimization method of time model was pointed out. Finally, the optimal task execution sequence and exact time model of process were obtained. The validity and the optimization of the model with an instance were proved.

Concurrent Products Development DSM Time Overlapping and Iteration Time Model

Feng Tao Chen Bing Zhang Dinghua Li Shan

Key Laboratory of Contemporary Design & Integrated Manufacturing Technology (Northwestern Polytechnical University),Ministry of Education Xian, China

国际会议

2009 International Conference on Measuring Technology and Mechatronics Automation(ICMTMA 2009)(2009年检测技术与机电自动化国际会议)

张家界

英文

689-692

2009-04-11(万方平台首次上网日期,不代表论文的发表时间)