会议专题

A Bi-criteria Optimization Model and Algorithm for Scheduling in a Real-world Flow Shop with Setup Times

The bi-criteria scheduling problem optimization model in a real-life flow shop with setup times was built, while the similarity of jobs were considered. The case study differs from the conventional scheduling problems. A modified genetic local search algorithm to minimize makespan and maximum tardiness was proposed. Two new neighborhood structures based on the problem-concerned knowledge were defined, and were used in the local search procedure to improve efficiency of optimization. The performance of this algorithm was compared with two multi-objective genetic local search algorithms proposed in the literature, and the simulation experiment shows that the scheduling model and proposed algorithm are relatively effective.

Kaibing Yang Xiaobing Liu

CIMS Center, Dalian University of Technology, Dalian, 116024 China Information School, Dalian Polyte CIMS Center, Dalian University of Technology, Dalian, 116024 China

国际会议

International Conference on Intelligent Computation Technology and Automation(2008 智能计算技术与自动化国际会议 ICICTA 2008)

长沙

英文

535-539

2008-10-20(万方平台首次上网日期,不代表论文的发表时间)