会议专题

ANALYSIS THE OVER-DAM INFLOW FLOOD OF MAANGUAN RESERVOIR IN 2007

This paper has detailedly analyzed rainfall, waterlevel and outflow hydrograph recording to the overdam inflow flood. The inflow flood recurrence interval was evaluated, and the coordinate of outflow peak that stands falling segment of the inflow hydrograph was found. The paper has pointed out why it is illogical that using water-balance account inflow flood hydrograph. It is most important that the paper has obtained a simplex triangle method of accounting inflow flood of the reservoir, gave out steps and discussed conditions. Specially, the result and analytical method in paper is referenced to supervisor and designer for mountain reservoirs.

reservoir inflow flood of reservoir triangle method of accounting flood hydrograph over-dam flood reservoir operation basin lag the coordinate of outflow peak

Fang Chonghui Yang Xinming Duan Yahui

State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University, Wuhan Hubei Water Resources Bureau, Wuhan 430071, China State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University, Wuhan

国际会议

High-level International Forum on Water Resources and Hydropower(第一届国际水利水电高层论坛)

北京

英文

548-557

2008-10-17(万方平台首次上网日期,不代表论文的发表时间)