Study on the Optimization of the Bidding Program of the EPC Engineering Project

This article has provided a detailed analysis of the contractors unbalanced bidding strategies and the two evaluation methods currently used in project evaluation process in China, including the method of comprehensive evaluation and the method of winning bid at the lowest price. Likewise, based on the difference in the time of contractors engaged in the project, contracts, the time of constructions, and the scope of the owners rights between EPc Engineering and Chinese traditional engineering, the article has proposed the theory and method of value engineering (VE) at the tendering stage to contractors, used the life-cycle cost approach and the decision tree method to select the prograM object, applied the direct functional assessment approach to calculate the function value coefficient, exercised the value index method to calculate the function value, and finally selected the projects, which Vi is less than 1, to optimize.

EPC Bidding Value Engineering

LIU Hongyong HAN Neng HAN Xia

Southwest Petroleum University, Chengdu, China, 610500

国际会议

2010 International Conference on Industry Engineering and Management(2010 产业工程与管理国际研讨会)

江苏常州

英文

380-385

2010-03-26(万方平台首次上网日期,不代表论文的发表时间)