Study on Theory of Real-Time Dynamic Scheduling Optimization under the Drive of Construction Resource

Based on the mutually influencing and restrictive relationship between construction resource and schedule, taking account of limited resource and fixed duration, from the aspect of intelligently realizing resource and schedule optimization by the computer management information system (CMIS), brought forward Real-time Dynamic Scheduling Optimization under the Drive of Construction Resource(RDSODCR). It analyzed the mechanism, initialized condition, criterion and model of RDSODCR. The initialized condition included integrative coding, resource scheduling statistic of contract duration and statistical period; the criterion included choosing condition of excellent or bad to adjust and optimize; the model included primal and real-time resource scheduling adjustment. This theory was one of effective methods of intelligently realizing resource/schedule optimization, especially resource statistic of contract duration and statistical period, setting limited resource according to the state of construction and resource supplying, choosing adjustment object to optimization.

drive of resource real-time dynamic scheduling optimization integrative coding

ZHANG Shengping QI Shenjun CHEN Xu CHU Xiujuan

Grade I Certified Constructors, college ofmanagement and economy, Kunming University of Science andT School of Civil Engineering & Mechanics HuazhongUniversity of Science and Technology, Wuhan, China 4 Grade I Certified Structural Engineers, Southwest ForestryUniversity, Kunming, China 650224 College of Civil Engineering and Architecture, Kunming University of Science and Technology, Kunming

国际会议

2009 International Conference on Construction & Real Estate Management(2009建设与房地产管理国际会议)

北京

英文

283-287

2009-11-05(万方平台首次上网日期,不代表论文的发表时间)