Study on Water Resources Allocation Scheme for Yellow River Basin
It has been twenty years since the 87 Water Division Scheme of the Yellow River was carried out; as the quantity of water resources and the usage of water have been changing to guarantee the water security of key areas and key industries with the implementation of the South-to-North Water Diversion Project. It is necessary to adjust the water resources configuration scheme of the Yellow River. After a comprehensive analysis of the principles of the Yellow River water resources allocation, to consider the coordination of regional development and river health, coordinating development among water demand for life, production and ecology, and the balance of supply and demand, water resources allocation scheme for the next three stages is proposed, i. e. after the operation of East, Center Lines of South-to-North Water Diversion Project, and the first stage of West Line of South-to-North Water Diversion Project. Due to water resources shortages of Yellow River Basin, water shortages in three stages are configured both within and outside the river water. It will be ameliorated after first stage of West Line of South-to-North Water Diversion Project, with water shortage controlled below 5% both inside and outside the river.
water resources allocation water shortage analysis 87 Water Division Scheme Yellow River basin
Zhang Xinhai Zhao Maihuan Yang Libia
Yellow River Engineer Consulting Co, Ltd, Zhengzhou, 450003, China
国际会议
郑州
英文
140-149
2009-10-20(万方平台首次上网日期,不代表论文的发表时间)