Study on Management Mode of Flood Control Projects in Lower Yellow River-the Subject Study of ADB Loan Project for Yellow River Flood Control
There are three management modes of flood control projects in lower Yellow River, namely the System of Project Corporation Responsibility, Self-management System and Agent Construction System. This paper firstly makes analysis and comparison of advantage and disadvantage of these three modes. According to management practice of Asian Development Bank (ADB)loan project for Yellow River flood control, this paper concludes a new type project construction mode-the Comprehensive Management Mode. It assimilates advantage from three existing modes and is provided with advanced management concept of ADB.
lower Yellow River flood control projects management mode study
Zhang Jing Li Yuehui
Henan Yellow River Reconnaissance, Design and Research Institute, YRCC, Zhengzhou, 450003, China Yellow River Conservancy Commission, Zhengzhou, 450003, China
国际会议
郑州
英文
1633-1636
2009-10-20(万方平台首次上网日期,不代表论文的发表时间)