Successful strategies for dewatering wells using ESPs

Pumping water from a well is a straight forward effort that has been done for centuries. Pumping fluid from relatively shallow wells should be an easy task. Normally a pump is installed in a well, started and then forgotten. This premise does not hold true in CBM wells. In CBM wells, this pumping process can be complicated by many issues unless precautions are taken. This paper is designed to address the basic precautions that can be taken to improve dewatering of CBM wells and will focus on real experiences in producing CBM wells and the steps required to make them economical. Even though every well is different, this paper will focus on the common areas that are key to getting acceptable performance using an ESP as the primary artificial lift method. As in most pumping situations, success is planned for and not just an accident. 1.Electric Submersible Pumps (ESPs) best practices for a vertical well: This paper will address the key areas of importance for optimizing operations in a vertical well. The paper will address issues like proper motor cooling, successful operation in turbulent conditions and gas lock avoidance and solids control. This paper will concentrate on these three items and show through real case histories how CBM can be successfully produced through proven dewatering techniques. 2.Electric Submersible Pumps (ESPs) best practices for a horizontal well: A horizontal well is a place an ESP flexibility can really shine. This paper will identify the key areas that drastically improve the chances of success. The paper will identify the operational differences and the different options in running in a horizontal well compared to a vertical well. It will cover the preplanning required to avoid negative operational issues including gas locking, solids intrusion and optimized drawdown. This paper will concentrate on these two items and highlight techniques that will increase the effectiveness of utilizing ESP equipment for dewatering.

CBM dewatering pumps electric submersible pumps artificial lift well bores wells solids control

L. Bassett

CBM General Manager, Casper, Wyoming, USA 82604 Borets Weatherford, Casper Wyoming, USA

国际会议

2009 Asia Pacific Coalbed Methane Symposium and 2009 China Coalbed Methane Symposium(2009亚洲太平洋国际煤层气会议暨2009年全国煤层气学术研讨会)

徐州

英文

421-426

2009-09-24(万方平台首次上网日期,不代表论文的发表时间)