会议专题

Principle of well-net design for coalbed methane ezploitation in coal mining area

There are abundant CBM (Coalbed Methane) in China. These CBM has caused a remarkable problem to the coal-mining in China. In order to improve the structure of Chinese energy and eliminate the risk of coal mine gas, the relevant industries and sections have implemented many explorations in CBM enriched areas. With great achievements, there are many important problems in the actions of CBM exploitation. The disadvantageous interaction of the surface CBM well and the later coal mining has been ignored at all. There are many disadvantages and defects. To solve these problems and eliminate or weaken the disadvantageous, the scientific and reasonable design of surface CBM well location is an important step. With the thinking of surface condition, coal mining plan, the arrangement of coal mine laneway, the direction and scale of the in-situ stress, and thinking more about the negative influence to and of surface CBM well, according to the theories of mining dynamics, mining engineering, mining geomechanics, and the CBM engineering, the design theory of the surface CBM well net can be studied. Finally, the arrangement principle of CBM product well in coal field is presented. The existing or future coal pillar will be a critical location for the surface CBM well location.

coalbed methane well-net design coal mining

B. S. Han J. J. Wang

Xian Branch, China Coal Research Institute, Xian, 710054, Shaanxi,China Ningxia Tiandi Benniu Industrial Group Co., Ltd, Shizuishan, 753001, Xingxia, China

国际会议

2009 Asia Pacific Coalbed Methane Symposium and 2009 China Coalbed Methane Symposium(2009亚洲太平洋国际煤层气会议暨2009年全国煤层气学术研讨会)

徐州

英文

448-456

2009-09-24(万方平台首次上网日期,不代表论文的发表时间)