会议专题

REHABILITATION OF THE THIRD SHIQIAO BRIDGE BY EXTERNAL PRESTRESSING

In this paper, the cracks on web of the third Shiqiao Bridge are demonstrated by pictures including the location and geometry of those cracks. The deficiencies of performance and cracks due to the incorrect design of web and the lower shear resistance are discussed. In order to suppress the crack propagation and improve the shear strength of the web, the external prestressing method is proposed after several debates. The formation of external prestressing cable, the arrangements and control stress of tendons are explored. Some critical aspects, such as deviator and anchorage, are designed carefully. The analytical model is developed by bridge software, the internal forces and stress have been calculated by computer. By comparison, it can be known that the safety margin increases and the crack propagation can be suppressed efficiently.

Crack propagation ezternal prestressing rehabilitation

Hai-Bo Jiang Wei-Jian Yi Chun-Gen Wei Fei-Xin Huang

Faculty of Civil and Transportation Engineering,Guangdong University of Technology,Guangzhou 510006, College of Civil Engineering,Hunan University,Changsha 410082,P.R. China

国际会议

The 4th Internatiuonal Symposium on Lifetime Engineering of Civil Infrastructure(第四届土木工程结构生命周期国际学术研讨会)

长沙

英文

320-323

2009-10-26(万方平台首次上网日期,不代表论文的发表时间)