会议专题

FIELD EXPERIMENTS AND NUMERICAL SIMULATION ANALYSIS ON EXPLOSION IN STEEL TUBES

To demolish the concrete cutoff wall successfully in one blasting was a difficulty in the demolition of downstream cofferdams in the second stage of Three Gorges Project (TGP). If only the concrete was crushed in the blasting while the grouting steel tubes and its supports which were pre-buried in the cutoff wall were still intact or unbroken, the underwater excavation of these crushed concrete could not be preceded. Measures by which grouting steel tubes and its supports can be blasted into segments should be researched. In-situ experiments were carried out to study the influence of different factors such as charge structures, cartridge diameters on the destruction of steel tubes in explosions. Numerical simulation of the explosion in the steel tubes were performed by software ANSYS/LS-DYNA. The relationships between the failure mode of steel tubes and charge structures were discussed and proper blasting parameters and charge structure were selected based on these discussions. The research achievements were proved to be reliable by the successful demolition of the cofferdam.

TGP concrete cutoff wall ezplosion of steel tube numerical analysis field testing

Xin-Ping Li Yi-Fei Dai Jin-Huan Liu Ming Zeng Li-Sheng Liu Kai-Guang Zhang

Wuhan University of Technology,Wuhan,Hubei 430070,P.R.China Daduhe Hydropower Development Co. Ltd.,Chengdu,Sichuan 610016,P.R.China Gezhouba Group Corporation,Yichang,Hubei 443002,P.R.China

国际会议

The 4th Internatiuonal Symposium on Lifetime Engineering of Civil Infrastructure(第四届土木工程结构生命周期国际学术研讨会)

长沙

英文

488-493

2009-10-26(万方平台首次上网日期,不代表论文的发表时间)