Calculation Method of Delay Claims with Multi-event Interference Based on Shapley Value

As an important measure for parties of the contract to protect their own interests,project claim is the core of project contract management. For claims of time delay under multi-agent and multi-event interference,it is difficult to assess the responsibility. To solve this problem,this paper presents a new analytical method based on Shapley value,and brings forward a new parameter called correction Factor to denote the affecting degree of every interference event. On the basis of this method,project delay responsibility is allotted to each single responsible activity,and then allotted to both owner and contractor in each single responsible activity. Finally,the responsibility is re-allotted to the responsible parties through Correction Factor. This method takes into account the impact of the interference event,and makes the responsibilitysharing more equitable.

Correction Factor Responsibility-sharing Shapely value

Dong-hong Cui Li Yao

Department of Management,Shenyang University of Technology,Shenyang 110178,China

国际会议

2009 IEEE 16th International Conference on Industrial Engineering and Engineering Management(IEEE第16届工业工程与工程管理国际学术会议)

北京

英文

420-423

2009-10-21(万方平台首次上网日期,不代表论文的发表时间)