会议专题

Optimization of Assembly Line Based on Work Study

The target of the study is the assembly line of lamp in one company. We analyze the producing process in detail. We found that there existed some problems such as bottleneck process and unbalanced line. To solve these issues we used the MOD method in work study as well as ECRS principle. The new plan merged and simplified the entire operating process,reduced workers and increased the rate of production line balancing.

Assembly Line ECRS Principle MOD Method Work Study

Shuang Lan Xue Wang Lixin Ma

Light Industry Coilcge,Harbin University of Commerce,Harbin,P.R.China College of Food Engineering,Harbin University of Commerce,Harbin,P.R.China

国际会议

2009 IEEE 16th International Conference on Industrial Engineering and Engineering Management(IEEE第16届工业工程与工程管理国际学术会议)

北京

英文

813-816

2009-10-21(万方平台首次上网日期,不代表论文的发表时间)