Research on lead time of supply chain and its interrelated cost
On the basis of comprehensive analysis of the leadtime (LT) of supply chain(SC) and the research of the interrelated cost,with setting related assumptions,the mode of lead-time reduction and related costs that faces the two-echelon supply chain composed of manufactures and suppliers is established. Finally,it is concluded that the total cost in the two-echelon supply chain is the convex function of the lead time. Besides,the total cost will be obtained at each interval end point. Through the concrete cases,after clashing the lead-time,the manufacturers cost will decrease,while the suppliers cost will increase. Whats more,the range of decreasing cost is greater than that of the increasing cost. Therefore,transferred payment is needed to properly compensate the supplier.
Lead-time reduction supply chain coordination manufacturers cost suppliers cost
Qiang Lin Qing Li Hui Shi
Dept.of Logistic engineering,School of management,Tianjin University,Tianjin,China
国际会议
北京
英文
1569-1573
2009-10-21(万方平台首次上网日期,不代表论文的发表时间)