Critical Path for a Grey Interval Project Network
In systems analysis, uncertainties may exist in model parameters and input data. Those uncertainties can propagate through the analysis and generate uncertainties into systems analysis. Grey systems theory offers a method for incorporating uncertainties into systems analysis. According to grey systems theory and the characteristics of interval plan network, this paper gives the method of the multiobjective making critical path. Examples are provided at the end to verify the feasibility of this method which combines subjective factors with objective factors.
Song Zhongmin Yan Xizu
School of Mathematics and Information Science,Yantai University, Shandong, China 264005 School of Mathematics and Information Science, Yantai University, Shandong, China 264005
国际会议
2009 IEEE International Conference on Grey System and Intelligent Services(2009 IEEE灰色系统与服务科学国际会议)
南京
英文
697-701
2009-10-20(万方平台首次上网日期,不代表论文的发表时间)