The Practices on Rapid Restart of No. 3 BF in Shougang Group

There’s medium repair on the No.3 BF of SG during the course of limiting production as the Olympic Games held in Beijing. We established perfect the blowing-on plans ahead of the schedule. Via adjusting the basic operation system and controlling operational parameters well, the No.3 blast furnace was restarted safely, rapidly and agreeable. It reduced much more production costs, and then advanced the economic performance.

BF blowing on rapid comeback

ZHANG He-shun CHEN Jun WEI Song-min

Shougang Ironmaking Plant