Technical Progress of CFRD Constructed on Deep Alluvium
For CFRD constructed on deep alluvium foundation,the design of directly putting plinth on alluvium foundation and connecting foundation diaphram wall,plinth,concret face slab to form an integral seepage control system is a kind of safe and economic solution.In recent years,China has a-chieved remarkable technical progresses in building high CFRD on deep alluvium foundation and accumulated rich experiences.For CFRD with this structure,the key technologies include:the investigation of structure,composition and engineering properties of alluvium foundation,the seepage control measures of alluvium foundation,the connecting method between seepage control measure of foundation and dam.More attentions should be paid on the differental settlement between diaphragm wall and connecting slab.Besides,the length of connecting slab will also be optimized.
deep alluvium CFRD technical progress
Xu Zeping
China Institute of Water Resources and Hydropoiver Research,Beijing 100048,China
国际会议
The 1st International Symposium on Rockfill Dams(第一届堆石坝国际研讨会)
成都
英文
45-51
2009-10-18(万方平台首次上网日期,不代表论文的发表时间)