Spillway Hydraulic Issues in Rebuilding Embankment Dams-Ezperiences from Vattenfalls Dam-Safety Program
In the light of the revised design floods and higher dam-safety requirements,many dams,owned by Vattenfall,have been rebuilt and many others undergo dam-safety evaluations or an upgrading process.Depending upon the dam in question,hydraulic concerns arising from the dam rebuilding may cover dam-slope erosion close to the spillway,increase of spillway discharge capacity,construction of new spillway or rebuilding of existing spillway,reshaping spillway channel,enlargement of stilling basin or plunge pool and risk for erosion in the dam toe or in the river channels downstream.In this paper,experiences and hydraulic issues of attention are summarised and discussed in the rebuilding of a number of embankment dams.
dam safety dam rebuilding spillway hydraulics ezperiences
James Yang Malte Cederstr(o)m
PhD,Professor,Vattenfall Research & Development & Royal Institute of Technology,Stockholm,Sweden MSc,Manager Dam-Safety Research,Vattenfall Generation Nordic,Stockholm,Sweden
国际会议
The 1st International Symposium on Rockfill Dams(第一届堆石坝国际研讨会)
成都
英文
133-139
2009-10-18(万方平台首次上网日期,不代表论文的发表时间)