Design Considerations of a High Rockfill Dam Nam Ngum 2 CFRD,Lao PDR

Nam Ngum 2 dam,a large concrete face rockfill dam (CFRD) of 182 m height,is under construction and impounding is scheduled to start at beginning of April 2010. The dam is situated in a narrow valley and founded on sedimentary rock of variable strength. Dam design principles comprising dam zoning,face slab design and instrumentation are outlined.Foundation treatment including grouting and measures below the plinth are presented. The properties of the available rockfill materials and their influence on the dam zoning are discussed. Emphasis is given to the rockfill properties and placement procedures which influence dam behaviour during construction,impounding and operation.

CFRD rockfill face slab instrumentation

Ruedi Straubaar Eva van Gunsteren Stephen Moll

Geotechnical and Dam Engineering Expert,P(o)yry Energy Ltd.(formerly Electro-watt Engineering Ltd.) Project Engineer and Assistant Project Manager for Nam Ngum 2,P(o)yry Energy Ltd.(formerly Electro-w Dam Engineer,P(o)yry Energy Ltd.(formerly Electro-watt Engineering Ltd.) Hardturmstrasse 161,CH-8037

国际会议

The 1st International Symposium on Rockfill Dams(第一届堆石坝国际研讨会)

成都

英文

183-193

2009-10-18(万方平台首次上网日期,不代表论文的发表时间)