会议专题

Studies and Application of the Utilization of Crushed Siltstone in Core of Earth Rockfill Embankment

The Ghazi-Barotha Hydropower Project is a super-scale project in the Islamica Republic of Pakistan. The Barrage across the river Indus,located near Ghazi about 9 km downstream of the Tarbela Dam,diverts water into the 54 km long power channel. This carries the water to the Power Complex near the village of Barotha. The Power Complex is designed to provide peaking capacity for a minimum of approximately 4 hours a day.In order to allow storage of water for power generation,a 10 km long embankment is built at the tail of diversion channel by using of siltstone as core and sandy gravel as shells from the excavation of structures in the power complex. This paper describs the application and investigation of using siltstone as core for earth rockfill embankment.

siltstone crushing rolling screening controlling

Peng Yunhe

Sinohydro Engineering Bureau 8,Changsha,China

国际会议

The 1st International Symposium on Rockfill Dams(第一届堆石坝国际研讨会)

成都

英文

385-392

2009-10-18(万方平台首次上网日期,不代表论文的发表时间)