Research on Simulation Based Dynamic Earthwork Allocation Balance for Liyang Concrete Faced Rockfill Dam
Based on analyzing of various considerations which is timely and spatially related to allocation system of filling and excavation projects in Liyang concrete faced rockfill dam(CFRD),an earthwork dynamiC allocation model is set up,and then the visual dynamic simulation system is developed,by which the construction proposals of different excavation and filling schedule are compared to select the final allocation program.
earthwork allocation dynamic balance compter simulation concrete faced rockfill dam pumped storage power station
Zhao Chunju Zhou Yihong Hu Yulin
China Three Gorges University,Hubei Key Laboratory of Construction and Management in Hydropower Engi Mid-South Design & Research institute,Changsha 410014,China