会议专题

Research of A New Moving-Sidewall Construction Technology of CFRD and Application in Chahanwusu Hydropower Station

Based on the study,analysis and demonstration of a new construction technology of slope cushion material of concrete face rockfill dams,this paper introduces a new moving-sidewall construction technique,which has been applied in cushion material construction of concrete face rock-fill dam at Xinjiang Chahanwusu Hydropower Station. After quality test on-site,it proved that the new technology met the design standards and showed fairly good prospects in future construction.

concrete face rockfill dam cushion material moving side-wall construction technology

Zhang Chenglong Wei Chunxia Chen Hongwu Wang Zhanchen He Quansheng

Xinjiang Kaidu River Basin Hydropouier Development Co.Ltd.,Urumqi 830000,China China Water Northeastern Investigation,Design & Research Co.Ltd.,Changchun 130061,China

国际会议

The 1st International Symposium on Rockfill Dams(第一届堆石坝国际研讨会)

成都

英文

603-608

2009-10-18(万方平台首次上网日期,不代表论文的发表时间)