Analysis of the Seepage Monitoring Results of Qiaoqi Dam
In this paper,seepage monitoring data of Qiaoqi dam in the parts of clay core wall,concrete cutoff wall,anti-seepage curtain and so on,were systematically analyzed.For the monitoring data in key parts,multiple regression statistical models were used to discuss the impact factor in order to explore the law of the seepage development and change.Finally,combined with designed seepage parameters to evaluate the operation behavior of anti-seepage system. The analysis results showed that the anti-seepage system was in normal operation at present.But the situation of seepage around the dam should be further monitored.Meanwhile,the fault elimination effect of leakage point # 8 and # 35,and of cut-off wall near UP14 have not been through the test of normal water level. The operation situation under normal water level needs to be paid further attention.
Qiaoqi dam seepage monitoring regression analysis seepage gradient water level potential
Lang Xingxue Cui Huidong Qi Yue
Lubuge Consulting Co.,Ltd.,Kunming 650041,China
国际会议
The 1st International Symposium on Rockfill Dams(第一届堆石坝国际研讨会)
成都
英文
743-751
2009-10-18(万方平台首次上网日期,不代表论文的发表时间)