Analysis of the Abnormal Water Level of Piezometric Tube UP14 at Qiaoqi Dams Foundation Gallery
This article gives descriptions on data of piezometric tube UP14 at Qiaoqi dams foundation gallery and the grouting process of the cut-off wall,analyzes the exact location of dams defects in the cut-off wall and the effectiveness of grouting work,it also gives a brief description on the methods of searching for the location of cut-off walls defects.
Qiaoqi dam piezometric tube cut-off wall grouting treatment
Dai Bikui Wang Xunbo Xiong Chunfa
Sichuan Huaneng Baoxing Riuer Electric Power shares Co.Ltd.,Yaan 625000,China Yunnan Lubuge Consulting co.Ltd.,Kunming 650051,China
国际会议
The 1st International Symposium on Rockfill Dams(第一届堆石坝国际研讨会)
成都
英文
783-788
2009-10-18(万方平台首次上网日期,不代表论文的发表时间)