Analysis of the Abnormal Water Level of Piezometric Tube UP14 at Qiaoqi Dams Foundation Gallery

This article gives descriptions on data of piezometric tube UP14 at Qiaoqi dams foundation gallery and the grouting process of the cut-off wall,analyzes the exact location of dams defects in the cut-off wall and the effectiveness of grouting work,it also gives a brief description on the methods of searching for the location of cut-off walls defects.

Qiaoqi dam piezometric tube cut-off wall grouting treatment

Dai Bikui Wang Xunbo Xiong Chunfa

Sichuan Huaneng Baoxing Riuer Electric Power shares Co.Ltd.,Yaan 625000,China Yunnan Lubuge Consulting co.Ltd.,Kunming 650051,China