Adding Value By Improving The Performanceof Facilities
Value based methods are ideal for conserving resources for large, complex projects throughout the world. This presentation will utilize a number of international projects as case studies to illustrate how value based design decision-making methods were used to maximize value and conserve resources. Key VM principles often forgotten in large, complex projects will be discussed. In addition, large projects offer VM strategies that are not possible with small projects. Likewise complex projects require strategies that are somewhat different than simple projects. The presenter has years of first hand experience in applying the techniques of FAST, quality modeling, risk modeling, creativity, choosing by advantages (CBA) and life cycle costing (LCC) to improve on some very prestigious large, complex international projects. The audience will become familiar with performance issues particular to each case study, such as security, maintainability, quality, sustainability, schedule, constructability, operational effectiveness, as well as the life cycle cost implications. Twelve case studies will help illustrate key points.
Stephen J.Kirk
Kirk Associates,LLC 1177 Berkshire Road,Suite 100 Grosse Pointe Park,MI 48230,USA
国际会议
The 2nd International Conference on Vale Engineering and Vale Management(2009)(2009年北京价值工程与价值管理国际会议)
北京
英文
13-22
2009-10-16(万方平台首次上网日期,不代表论文的发表时间)