会议专题

Application of Value Engineering in Optimizating Mine Production System Capacity

In the process of checking production capacity, coal mine has surplus production capacity in some parts of production systems or processes, and it causing unnecessary resource wastes; therefore it is essential to optimize production capacity of coal mine production system which having much more resources wastes. In order to solve the problem, the paper propose that it used value engineering method to estimate the cost, function and value of optimize scheme of coal mine production system capacity, established model of choosing experts and optimizing model of coal mine production system capacity, then took and analyzed an example. The result shows that value engineering method is suitable for optimizing coal mine system capacity and it can guide coal mine practical practice.

Checking production capacity Mine production system Optimization Value engineering methods

Shao-jun DAI Chuan-bo HAO

Institute of System Engineering,Hei longjiang Institute of Science and Technology,Harbin,P.R.China 150027

国际会议

The 2nd International Conference on Vale Engineering and Vale Management(2009)(2009年北京价值工程与价值管理国际会议)

北京

英文

93-99

2009-10-16(万方平台首次上网日期,不代表论文的发表时间)