Project risk modeling and simulation based on DSM

The design structure matrix method is used in risk estimate and control of project management An improved risk index model is proposed for schedule risk and cost risk by reason of rework iteration. The simulation model based on design structure matrix is applied to analyze single risk and combination risk in large-scale project On the condition of uncertain execute time and given optimal execute sequence of tasks, relation between cost and schedule is Weibull distribution. Random nature of rework iteration and learning effect are also taken into consideration during executing process. Simulation example proves that the risk index for project management is validity and dynamicity.

design structure matriz risk indez learning effect rework simulation

Xiao-long LIU Bin DU Dong-yu CHEN

School of Economics & Management,Beihang University,Beijing 100191,China School of Economics & Management,Beihang University,Beijing 100191,China School of Information Manag

国际会议

The 2nd International Conference on Vale Engineering and Vale Management(2009)(2009年北京价值工程与价值管理国际会议)

北京

英文

251-257