会议专题

Analysis on dam-breaking mode of Tangjiashan Barrier Dam in Beichuan County

Tang Jiashan landslide is a typical high speed bedding glide in a middle-steep dip angle. The whole time of sliding is about a half minute. And its height difference is 540 meter, meanwhile speculated gliding speed is about 20.8 meter per second. The length of the barrier dam which is formed by the high speed landslide along the river is 803.4 meter, the maximum of the width crossing the river is 611.8 meter, and its volume is estimated about 20.37 million stere. On the basis of the barrier dam geological mapping results, combining the result of reconnoiter text which had been got on the locale of Tang Jiashan before earthquake happened, analysis is studied on the geological structure of barrier dam and the stability of upstream and downstream of barrier dam when the dam is in different water level and when afiershock of 7-8 degrees happen. On this basis, this paper is discussed that the mode of the barrier dam deeply. And its analytic results provid some important guidance and advice which had been accepted to the front headquarters of Tang Jiashan barrier dam so that the front headquarters can do some proper engineering measures and make the flood discharge well.

HU Xiewen LV Xiaoping LUO Gang HU Xiewen Huang Runqiu SHI Yubin

School of Civil Engineering,Southwest Jiaotong University,Chengdu,Sichuan 610031,China State Key Laboratory of Geohazard Prevention and Geoenvironment Protection,Chengdu University of Tec Chengdu Hydroelectric Investigation and Design Institute,China Hydropower Consulting Group,Chengdu,S

国际会议

International Symposium and The 7th Asian Regional Conference of IAEG(国际工程地质与环境协会年会暨第七届亚洲工程地质会议)

成都

英文

559-566

2009-09-09(万方平台首次上网日期,不代表论文的发表时间)