Development of Pressure Control System of Lifting and Moving Rail Equipment Test Bench
LMRE is a key tool for railway maintenance,whose function is lifting and moving the rail for repairing. The LMRETB is designed for testing the LMRE lifting high,lifting pressure and sinkage after 3 minutes keeping pressure. The pressure loading system of the test bench is an electric hydraulic pressure servo control system. Because the overshoot and slow response of the pressure hydraulic control system,which affect the dynamic performance,therefore,the pressure control strategy is the main research object in this paper. Firstly,the pressure control system mathematic model was established,and the open loop transfer function of the valve-controlled system was obtained via the model. Secondly,the pressure control system characteristics were analyzed via the transfer function. Finally,according to the fuzzy control theory,the fuzzy-PID controller was designed. The experiments show that the performance of pressure control system of the test bench is obviously improved.
test bench control model dynamic performance fuzzy-PID control.
Zhengyao Yi Wei Xiong Haitao Wang Jian Wu Zuwen Wang
Institute of Shipping Electromechanics Equipment,Dalian Maritime University,116026,China School of Mechanical and Electrical Engineering,Harbin Institute of Technology,157000,China
国际会议
2009 9th International Conference on Electronic Measurement & Instruments(第九届电子测量与仪器国际会议 ICEMI2009)
北京
英文
2790-2795
2009-08-16(万方平台首次上网日期,不代表论文的发表时间)