会议专题

Selecting HVAC Systems for Typical UK Office Buildings

The energy performance of different HVAC systems varies, and, more importantly, is dependent to the characteristics of the building. To select a suitable HVAC system for a particular building at early design stages presents a significant challenge to engineers. In this paper, we use a typical open-plan UK office building to analyse the correlation between its dynamic load profile and the performance of various HVAC systems. EnergyPlus models of the building and the systems are created. A number of parameters (e.g. insulation level, HVAC system types, supply air temperature setpoint and fresh air supply) that affect the heating/cooling energy consumption are varied. By nmning a series of experiments and analysing the results, we aim to provide guidelines to assist the selection of HVAC systems for UK office buildings.

HVAC System Office building Energy performance VAV CAV

Ivan Korolija Yi Zhang Ljiljana Marjanovic-Halburd Vic I Hanby

Institute of Energy and Sustainable Development,De Montfort University,United Kingdom Department of Built Environment,Anglia Ruskin University,Chelmsford,United Kingdom

国际会议

The 6th International Symposium on Heating,Ventilating and Air Conditioning(第六届国际暖通空调学术会议)

南京

英文

388-396

2009-11-06(万方平台首次上网日期,不代表论文的发表时间)