Reducing the Risk of Reinforcement Corrosion in Concrete Structures and Stray Current Prevention in Metro Line
The paper describes various models of steel corrosion caused by stray current in Metro line. Different model has different performance during service life stage. Their differences are presented by laboratory experiments. Furthermore, the paper describes different stray current collection ways. Extra stray current caused by extension construction has been analyzed. Key factors influenced on extra stray current are provided. Finally, reasonable extension construction ways has been provided to reduce stray current and reduce the risk of reinforcement corrosion in Concrete structures.
Stray current pit corrosion risk of corrosion eztensionconstruction structure durability
Tang Yongjing
The Department of Geotechnical Engineering of Tongji University Key Laboratory of Geotechnical and Underground Engineering of Ministry of Educa-tion,Tongji University
国际会议
The 2nd International Conference on Risk Analysis and Crisis Response(第二届风险分析与危机反应国际学术研讨会)
北京
英文
355-359
2009-10-19(万方平台首次上网日期,不代表论文的发表时间)