USING L-M BP ALGORITHM FORECASE THE 305 DAYS PRODUCTION OF FIRST-BREED DARIY
Aiming at the shortage of conventional BP algorithm, a BP neural net works improved by L-M algorithm is put forward. On the basis of the network, a Prediction model for 305 days milk productions was set up. Traditional methods finish these data must spend at least 305 days, But this model can forecast first-breed dairys 305 days milk production ahead of 215 days. The validity of the improved BP neural network predictive model was validated through the experiments.
Dairy Milk production prediction Neural Networks BP algorithm-M algorithm.
xiao-li wei guo-qiang qi wei-zheng shen sun jian
Agricultural engineer center,Northeast Agricultural University,Harbin,Heilongjiang province ,china ,150030
国际会议
北京
英文
1-6
2009-10-14(万方平台首次上网日期,不代表论文的发表时间)