会议专题

An Integrated Model for Optimizing Maintenance and Inspection of Potential Failures

In this paper, an integrated methodology is developed for optimizing inspection and maintenance of a component where delayed repair is considered to be one of feasible options. The models of failures,risk and life cycle cost are developed using probability,stochastic process and the delay time concept The model is intended to optimise the inspection intervals and the delay of repair simlutaneouly and then develop an optimal maintenance policy for a component under nonperiodic inspection regime.The performance of the proposed model is illustrated by an example and the effects of inspection and time of delay fur repair on life cycle cost are shown.

inspection policy failure maintenance optimisation

Jianmin Zhao Shengbing Miao Senlin Zhang

Department of management Shijiazhuang Mechanical Engineering College,050003 Shijiazhuang,China

国际会议

2009 8th International Conference on Reliability,Maintainability and Safety(第八届中国国际可靠性、维修性、安全性会议)

成都

英文

626-629

2009-08-24(万方平台首次上网日期,不代表论文的发表时间)