Preliminary Study on Reliability-Centered Maintenance of High-speed Train
Some characteristics about reliability,maintainability and testability of our high-speed trains would be analyzed deeply in this paper.On this foundation, the feasibility of applying the Reliability-Centered Maintenance (RCM) system to high-speed trains would be demonstrated, and some problems,such as fault assortment,fault effect,fault law,maintenance mode, maintenance task type and so forth, arc researched.Furthermore, the preliminary RCM method for high-speed trains is established. The application of RCM to high-speed trains is illuminated via an example.Finally,conclusions and suggestions about RCM of high-speed trains are put forward.
high-speed train reliability maintainability RCM
Huasheng Wang Xiaobing Ma Lin Zhang Li Wen
Locomotive and Car Research Institute China Academy of Railway Science Beijing,100081,China Dept of System Engineering of Engineering Technology Beihang University Beijing 100191,China
国际会议
2009 8th International Conference on Reliability,Maintainability and Safety(第八届中国国际可靠性、维修性、安全性会议)
成都
英文
633-638
2009-08-24(万方平台首次上网日期,不代表论文的发表时间)