The Rush-repair Task Assignment Model of Damage Equipment Based on Urgent Level
Based on the characteristics of the equipment support and the current war factual situation, the rush-repair task of damage equipment was classified according to different urgent level.Then the rushrepair task assignment model was made based on the urgent level of the damaged equipment, and the method is given to solve the model.Finally, the example validates the model and the result indicates that the method operate simply and availability.
Urgent Level Rush-repair Assignment Model
ZHANG Lin YU Jiang-min WANG Wen-feng FAN Wen-xin
Missile Institute,Air Force Engineering University,Sanyuan Shannxi,China 713800 No 20 institute,CETC,Xian Shanxi China 710068
国际会议
2009 8th International Conference on Reliability,Maintainability and Safety(第八届中国国际可靠性、维修性、安全性会议)
成都
英文
674-677
2009-08-24(万方平台首次上网日期,不代表论文的发表时间)